Gasn 11 floors. State elemental estimated norms for construction work. Rules for calculating the scope of work
Before sending an electronic application to the Ministry of Construction of Russia, please read the rules of operation of this interactive service set out below.
1. Electronic applications in the field of competence of the Ministry of Construction of Russia, filled in in accordance with the attached form, are accepted for consideration.
2. An electronic appeal may contain a statement, complaint, proposal or request.
3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted for consideration to the department for working with citizens' appeals. The Ministry provides an objective, comprehensive and timely consideration of applications. Consideration of electronic appeals is free of charge.
4. According to federal law dated 02.05.2006 N 59-FZ "On the procedure for considering citizens' applications Russian Federation"electronic appeals are registered within three days and are sent depending on the content to the structural subdivisions of the Ministry. The appeal is considered within 30 days from the date of registration. An electronic appeal containing issues, the solution of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days from the date of registration to the appropriate body or the appropriate official, whose competence includes resolving the issues raised in the appeal, with notification of this to the citizen who sent the appeal.
5. An electronic appeal is not considered when:
- the absence of the name and surname of the applicant;
- indication of an incomplete or inaccurate postal address;
- the presence of obscene or offensive expressions in the text;
- the presence in the text of a threat to the life, health and property of an official, as well as members of his family;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already received a written answer on the merits in connection with previously sent appeals.
6. The response to the applicant of the appeal is sent to the postal address specified when filling out the form.
7. When considering an appeal, it is not allowed to disclose the information contained in the appeal, as well as information relating to the private life of a citizen, without his consent. Information about the personal data of applicants is stored and processed in compliance with the requirements of Russian legislation on personal data.
8. Appeals received through the site are summarized and submitted to the leadership of the Ministry for information. The answers to the most frequently asked questions are periodically published in the sections "for residents" and "for specialists"
Collection #11
floors
GESN-2001-11
Technical part
1. General instructions
1.1. These State elemental estimated norms ( GESN) are designed to determine the need for resources (labor costs of workers, construction machines, materials) when performing a full range of basic, auxiliary and related works necessary for installing the main types of floors and drawing up cost estimates (estimates) using the resource method. GESN are the initial standards for the development of unit rates, individual and aggregated rates (prices).
1.2. GESN reflect the average industry costs for the operation of construction machines and mechanisms, technology and organization by type of construction work. GESN are obligatory for application by all enterprises and organizations, regardless of their affiliation and form of ownership, carrying out capital construction with the involvement of funds from the state budget of all levels and target extra-budgetary funds.
For construction projects financed at the expense of own funds of enterprises, organizations and individuals, GESN are recommendatory.
1.3. When installing chemically resistant floor coverings for rooms with aggressive environments, as well as when installing coatings and insulating trays and channels, the norms of the collection GESN-2001-13 "Protection of building structures and equipment from corrosion" should be used.
1.4. When installing screeds ( tab. 01-011 norms 1, 3, 5) to take into account the aggression of soil to concrete, the following resources should be added:
To the labor costs of workers - 1.09 man-hours;
For the operation of machines - bitumen boiler (code 121011) - 1.09 machine-hours;
To materials - bituminous mastic (code 101-0594) - 0.134 t.
1.5. When cutting vegetable soil, use the norms of the collection GESN-2001-1"Excavation".
1.6. Norms 2-8 tables 01-002 and norms tab. 01-003 are applied both for the device of underlying layers, and for the device of coverings.
1.7. When constructing a concrete underlayment with concrete-laying machines, in accordance with the rules for constructing cement-concrete road surfaces, the norms of the collection GESN-2001-27 "Motorways" should be used.
1.8. Rules 7 and 8 tab. 01-015 may be used only if there are instructions in the project.
1.9. Norms 1, 2 and 4 tab. 01-036 and norms 1-4 tab. 01-037 provide for the laying of linoleum, relin and carpets of plain (without a pattern) and colored (with a pattern) that do not require adjustment of the pattern at the joints. When laying linoleum, relin and carpets with a pattern that requires adjustment of the pattern at the joints, it is necessary to apply the coefficients of clause 3.3 of this technical part.
1.10. The norms for the installation of coatings do not take into account the cost of installing skirting boards, which should be taken additionally according to the relevant norms of the collection, depending on design decisions.
1.11. The “up to” size listed in this collection includes this size.
2. Rules for calculating the scope of work
2.1. The volume of the underlying layer (preparation) for floors should be calculated minus the space occupied by stoves, columns, protruding foundations and similar elements.
2.2. The scope of work on the installation of floor coverings should be taken according to the area between the inner edges of walls or partitions, taking into account the thickness of the finish provided for by the project; coatings in window sills and doorways are also included in the scope of work and are calculated according to design data.
The areas occupied by partitions (except for clean ones), columns, stoves, foundations protruding above the floor level, and similar structures are not included in the scope of work.
Collection #11
FLOORS
GESN-2001-11
ADDITIONS AND AMENDMENTS TO REGULATIONS
SECTION 01: FLOORS
Table GESN 11-01-004 Waterproofing device
Printed:
Scope of work:
01. Preparation of the base (standards 1, 3, 5, 7).
05. Coating insulation with bituminous mastic (standards 5, 6, 7, 8).
Scope of work:
01. Preparation of the base (standards 1, 3, 5, 7, 9).
02. Priming of the base (standards 1, 3, 5).
03. Device for pasting insulation (standards 1-4).
04. Covering the top layer of insulation with mastic (standards 1, 3).
05. Coating insulation with bituminous mastic (standards 5, 6, 7, 8).
06. Preparation of the primer (standards 1, 2, 3, 4, 5).
07. Preparation of bituminous mastic (standards 1, 2, 5, 6).
08. Primer preparation (norm 9).
09. Coating insulation with a primer (norm 9).
Meter: 100 m2 of insulated surface
11-01-004-9 Coating waterproofing device in one layer with a primer
Resource ID |
Cost element name |
Unit meas. |
|
Average work grade |
|||
Machinist labor costs |
|||
MACHINES AND MECHANISMS |
|||
Mobile bitumen boilers 400 l |
|||
Thermos 100 l |
|||
MATERIALS |
|||
Bitumen oil construction grades BN-90/10 |
|||
Kerosene for technical purposes grades KT-1, KT-2 |
|||
Table GESN 11-01-014 Installation of concrete floors by vacuuming
Scope of work:
01. Wetting the base with water.
02. Installation of lighthouse rails.
03. Reception and laying of the finished concrete mix with leveling.
04. Concrete compaction and surface leveling.
05. Laying filter sheets and suction mat.
06. Vacuuming.
07. Removal, cleaning and rinsing of filter cloths and suction mat.
08. Removal, cleaning of lighthouse rails and sealing of the remaining furrows.
09. Smoothing and grouting the surface of the coating.
Meter: 100 m 2 floor
Installation of concrete floors by vacuuming on granite rubble with a thickness of:
11-01-014-5 100 mm
Resource ID |
Cost element name |
Unit meas. |
|
Labor costs of construction workers |
|||
Average work grade |
|||
MACHINES AND MECHANISMS |
|||
complexes vacuum type SO-177 |
|||
MATERIALS |
|||
102-0114 |
Softwood lumber. Edged boards 2-3.75 m long, 75-150 mm wide, 25 mm thick grade IV |
||
401-0700 |
Heavy concrete, aggregate fraction 10 mm, class: B30 (M400) on crushed granite |
||
411-0001 |
Water |
Table GESN 11-01-044 Cutting seams in concrete
Scope of work:
01. Cutting seams in concrete.
02. Filling the seams with polyurethane cord (standard 1).
03. Filling the joints with sealant (norm 2).
Meter: 100 m
Cutting seams in concrete
11-01-044-1 when installing floors by vacuuming
11-01-044-2 with sealant filling
Resource ID |
Cost element name |
Unit meas. |
||
Labor costs of construction workers |
||||
Average work grade |
||||
Machinist labor costs |
||||
MACHINES AND MECHANISMS |
||||
Disc joint cutters |
||||
Cars onboard with a carrying capacity of up to 5 tons |
||||
MATERIALS |
||||
Sealant drying brand 51-G-13 |
||||
Germit (40 mm cord) |
Table GESN 11-01-045 Installation of bulk coatings
Scope of work:
01. Preparation of the base.
02. Priming of the base.
03. The device of a self-leveling floor with a ready mix.
04. Sanding the base
Meter: 100 m2
11-01-045-1 Installation of liquid coatings on epoxy resin ED 20 composition<Диапол 320>3 mm thick and primed<Диапол 112>0.5 mm thick
Resource ID |
Cost element name |
Unit meas. |
|
Labor costs of construction workers |
|||
Average work grade |
|||
Machinist labor costs |
|||
MACHINES AND MECHANISMS |
|||
Construction mast hoists 0.5 t |
|||
Mosaic grinding machines |
|||
Cars onboard with a carrying capacity of up to 5 tons |
|||
MATERIALS |
|||
Mixture for self-leveling floor “Diapol 320” |
|||
Primer “Diapol 112” |
Table GESN 11-01-046 Ironing the floor when constructing a floor from an end checker
Scope of work:
01. Ironing the floor.
Meter: 1 m 2
11-01-046-1 Ironing the floor when installing the floor from the end checker
Resource ID |
Cost element name |
Unit meas. |
|
Labor costs of construction workers |
|||
Average work grade |
|||
Machinist labor costs |
|||
MACHINES AND MECHANISMS |
|||
Iron |